Bc 50-Tseh So 29SJ 394 Room: Room 34 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East
Start: 8/7/1992 End: 14/7/1992 Person Days: 3.0
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mix



Bc 50-Tseh So 29SJ 394 Room: Room 34 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 006_11
Image #: 110213
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Note:
     Light loose or fallen chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 34 Story: 1st Story Wall: North Interior Year 1992
Treatment
Photo type: After 017_06
Image #: 110330
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 17.0
Mortar (# buckets): 2.0








Bc 50-Tseh So 29SJ 394 Room: Room 34 Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 006_10
Image #: 110212
Catalog #:        Accession #:
Condition:
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Light loose or fallen chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 34 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 017_05
Image #: 110329
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 16.0
Stone replaced (#): 6.0
Mortar (# buckets): 1.5