Bc 50-Tseh So 29SJ 394 Room: Room 26 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West, West
Start: 21/7/1992 End: 23/7/1992 Person Days: 2.5
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture



Bc 50-Tseh So 29SJ 394 Room: Room 26 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 011_04
Image #: 110260
Catalog #:        Accession #:
Condition:
Loose wall caps: Light
Mortar Erosion: Light
Basal Erosion: Light








Bc 50-Tseh So 29SJ 394 Room: Room 26 Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 023_03
Image #: 110391
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 12.0








Bc 50-Tseh So 29SJ 394 Room: Room 26 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 011_03
Image #: 110259
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Light








Bc 50-Tseh So 29SJ 394 Room: Room 26 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 023_01
Image #: 110389
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 24.0
Mortar (# buckets): 1.0








Bc 50-Tseh So 29SJ 394 Room: Room 26 Story: 1st Story Wall: West Exterior Year 1992
Condition
Photo type: Before 011_02
Image #: 110258
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Light








Bc 50-Tseh So 29SJ 394 Room: Room 26 Story: 1st Story Wall: West Exterior Year 1992
Treatment
Photo type: After 023_06
Image #: 110394
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 15.0
Mortar (# buckets): 1.5