Bc 50-Tseh So 29SJ 394 Room: Room 23 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 21/7/1992 End: 22/7/1992 Person Days: 1.0
 
Overall Comments: 1/1 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part soil Pastelike mixture.



Bc 50-Tseh So 29SJ 394 Room: Room 23 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 011_12
Image #: 110268
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 23 Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 024_10
Image #: 110407
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 6.0
Mortar (# buckets): 0.25
Treatment comment: Reset masonry was done but sq ft not noted.








Bc 50-Tseh So 29SJ 394 Room: Room 23 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 011_11
Image #: 110267
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 23 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 024_09
Image #: 110406
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 30.0
Mortar (# buckets): 3.0