Bc 50-Tseh So 29SJ 394 Room: Room 11 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East
Start: 14/7/1992 End: 15/7/1992 Person Days: 2.0
 
Overall Comments: 1/1 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture



Bc 50-Tseh So 29SJ 394 Room: Room 11 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 003_01
Image #: 110175
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Basal Erosion: Extreme
Note:
     Light loose or falling chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 11 Story: 1st Story Wall: North Interior Year 1992
Treatment
Photo type: After 015_05
Image #: 110305
Catalog #:        Accession #:
Treatment:
Treatment comment: Repointing sq ft unknown. 2 replaced stones total include site and fresh.








Bc 50-Tseh So 29SJ 394 Room: Room 11 Story: 1st Story Wall: East Interior Year 1992
Condition
Condition:
Loose wall caps: Extreme
Stone Erosion: Light
Basal Erosion: Light
Note:
     Light to extreme loose or falling chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 11 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 015_04
Image #: 110304
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 36.0
Mortar (# buckets): 1.0