Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South, West
Start: 8/7/1992 End: 13/7/1992 Person Days: 3.0
 
Overall Comments: 1/4.0 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay



Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 004_01
Image #: 110185
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or falling chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: North Interior Year 1992
Treatment
Photo type: After 013_10
Image #: 110288
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 6.0
Stone replaced (#): 10.0
Mortar (# buckets): 1.0








Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 003_09
Image #: 110183
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or falling chinking.








Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: South Interior Year 1992
Treatment
Treatment:
Repointing (sq ft): 6.0
Mortar (# buckets): 1.0








Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: West Exterior Year 1992
Condition
Photo type: Before 003_08
Image #: 110182
Catalog #:        Accession #:
Condition:
Note:
     No pre-treatment information available.








Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: West Exterior Year 1992
Treatment
Treatment:
Repointing (sq ft): 7.0
Stone replaced (#): 6.0
Mortar (# buckets): 1.0