Bc 50-Tseh So 29SJ 394 Room: Room 4 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East, West
Start: 16/7/1992 End: 21/7/1992 Person Days: 5.0
 
Overall Comments: 1/4.0 Rhoplex/water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture



Bc 50-Tseh So 29SJ 394 Room: Room 4 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 001_05
Image #: 110155
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light








Bc 50-Tseh So 29SJ 394 Room: Room 4 Story: 1st Story Wall: North Interior Year 1992
Treatment
Photo type: After 022_01
Image #: 110379
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 9.0
Stone replaced (#): 2.0
Mortar (# buckets): 1.0








Bc 50-Tseh So 29SJ 394 Room: Room 4 Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 001_03
Image #: 110153
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light








Bc 50-Tseh So 29SJ 394 Room: Room 4 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 022_02
Image #: 110380
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 12.0
Stone replaced (#): 9.0
Stone fresh: 9.0
Mortar (# buckets): 1.5
Treatment comment: 9 total replaced stone includes site and fresh.








Bc 50-Tseh So 29SJ 394 Room: Room 4 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 001_04
Image #: 110154
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light








Bc 50-Tseh So 29SJ 394 Room: Room 4 Story: 1st Story Wall: West Interior Year 1992
Treatment
Treatment:
Repointing (sq ft): 10.0
Stone replaced (#): 5.0
Mortar (# buckets): 1.5