Wijiji 29SJ 577 Room: Room 29 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded:
Start: End: Person Days:
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 29 Year 2016
Backfill
Start: Not specified/Not specified/2016 End: Not specified/Not specified/2017 Person days:
Comments:
Specific Information

Cubic yards of fill: 0.81
Backfill source type: Other Outside Park
Backfill other: John Atencio
Cloth barrier type: None
Cloth barrier other:
Other textile type:
Other textile other:
Other textile purpose:
Drain Information

Inlet:
T: L: Other: Other type:
Joint:
Y: 90: 45: 22: Other: Other type:
Drain pipe length: feet      Drain pipe diameter: inches
Avgerage height above geotextile: feet     
Drain pipe enters room through:      Other:
Drain pipe leaves room through:      Other:
Drain pipe leaves goes to:     
Evaporative Basins

Basin installed
Height above geotextile:
Basin size:
Capacity: gallons
Wood

Number of pieces buried:
Note:


Wijiji 29SJ 577 Room: Room 29 Wall: Unspecified Year 2016
Backfill
Photo type: Before Backfill 124287
Image #: 124287
Catalog #:        Accession #: 903








Wijiji 29SJ 577 Room: Room 29 Wall: Unspecified Year 2016
Backfill
Photo type: After Backfill 124289
Image #: 124289
Catalog #:        Accession #: 903