Chetro Ketl 29SJ 1928 Room: Room 53 Story: 2nd Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, North
Start: 20/9/2016 End: 21/9/2016 Person Days: 2.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 53 Story: 2nd Story Wall: North Interior Year 2016
Condition
Photo type: Before 124046
Image #: 124046
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Chetro Ketl 29SJ 1928 Room: Room 53 Story: 2nd Story Wall: North Interior Year 2016
Treatment
Photo type: After 124205
Image #: 124205
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 60.0
Mortar (# buckets): 1.5








Chetro Ketl 29SJ 1928 Room: Room 53 Story: 2nd Story Wall: North Exterior Year 2016
Condition
Photo type: Before 124045
Image #: 124045
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Chetro Ketl 29SJ 1928 Room: Room 53 Story: 2nd Story Wall: North Exterior Year 2016
Treatment
Photo type: After 124206
Image #: 124206
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 60.0
Mortar (# buckets): 0.75