Chetro Ketl 29SJ 1928 Room: Room 7 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
0.75 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South
Start: 7/9/2016 End: 7/2016 Person Days: 1.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 7 Story: 1st Story Wall: West Interior Year 2016
Treatment
Photo type: After 124093
Image #: 124093
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 19.0
Mortar (# buckets): 0.5








Chetro Ketl 29SJ 1928 Room: Room 7 Story: 1st Story Wall: West Interior Year 2016
Condition
Photo type: Before 123564
Image #: 123564
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Chetro Ketl 29SJ 1928 Room: Room 7 Story: 1st Story Wall: South Interior Year 2016
Condition
Photo type: Before 123555
Image #: 123555
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Chetro Ketl 29SJ 1928 Room: Room 7 Story: 1st Story Wall: South Interior Year 2016
Treatment
Photo type: After 124092
Image #: 124092
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 18.0
Mortar (# buckets): 0.25