Pueblo Bonito 29SJ 387 Room: Room 259 Story: 2nd Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South, West
Start: 26/7/2016 End: 26/7/2016 Person Days: 1.0
 
Overall Comments: mortar mixes/additives form lists 1:4 and 1:5 as the proportions of duraweld to water ratios



Pueblo Bonito 29SJ 387 Room: Room 259 Story: 2nd Story Wall: East Interior Year 2016
Documentation
Photo type: Documentation, No Treatment 121906
Image #: 121906
Catalog #:        Accession #: 894
Documentation:








Pueblo Bonito 29SJ 387 Room: Room 259 Story: 2nd Story Wall: South Interior Year 2016
Condition
Photo type: Before 121907
Image #: 121907
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Pueblo Bonito 29SJ 387 Room: Room 259 Story: 2nd Story Wall: South Interior Year 2016
Treatment
Photo type: After 123993
Image #: 123993
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 5.0
Mortar (# buckets): 0.25








Pueblo Bonito 29SJ 387 Room: Room 259 Story: 2nd Story Wall: West Interior Year 2016
Documentation
Photo type: Documentation, No Treatment 121908
Image #: 121908
Catalog #:        Accession #: 894
Documentation: