Pueblo Bonito 29SJ 387 Room: Room 227 Story: 3 Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 20/8/2016 End: 23/8/2016 Person Days: 2.0
 
Overall Comments: mortar mixes/additives form lists 1:4 and 1:5 as the proportions of duraweld to water ratios



Pueblo Bonito 29SJ 387 Room: Room 227 Story: 3 Wall: South Interior Year 2016
Treatment
Photo type: After 124013
Image #: 124013
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 9.0
Mortar (# buckets): 0.75








Pueblo Bonito 29SJ 387 Room: Room 227 Story: 3 Wall: South Interior Year 2016
Condition
Photo type: Before 121926
Image #: 121926
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified