Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Year 2003
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
5.0 Local source Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: NE Quad
Start: 3/6/2003 End: 2003 Person Days: 1.0
 
Overall Comments: did some capping 1o' x 32" long; replaced some stones for mortar, used Duraweld and mud



Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: NE Quad Interior Year 2003
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     needs repointing and needs capping; plus replaced some stones Original db Other: capping Original db Condition: Poor








Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: NE Quad Interior Year 2003
Treatment
Treatment:
Capping: 26.67
Mortar (# buckets): 5.0