Penasco Blanco 29SJ 410 Room: Room 30 Story: 2 Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 25/5/2016 End: 25/5/2016 Person Days: 1.0
 
Overall Comments: mortar thickness is described as soft/wetter on site overview form; duraweld mixes of 1 gallon to 4 and 5 gallons water on site overview form



Penasco Blanco 29SJ 410 Room: Room 30 Story: 2 Wall: East Interior Year 2016
Condition
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 30 Story: 2 Wall: East Interior Year 2016
Treatment
Photo type: After 123282
Image #: 123282
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 3.0
Mortar (# buckets): 0.25








Penasco Blanco 29SJ 410 Room: Room 30 Story: 2 Wall: South Interior Year 2016
Condition
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 30 Story: 2 Wall: South Interior Year 2016
Treatment
Photo type: After 123283
Image #: 123283
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 14.0
Stone replaced (#): 4.0
Mortar (# buckets): 0.5