Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Year 2003
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
6.0 Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
6.0 BLM quarry Dirt Duraweld C (1:4)
Sand Duraweld (other)
Outside park Clay
Comments:
Walls recorded: NE Quad, NW Quad, SE Quad
Start: 27/5/2003 End: 2/6/2003 Person Days: 2.5
 
Overall Comments: just sand and duraweld vertical wall



Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: NE Quad Interior Year 2003
Condition
Condition:
Mortar Erosion: Poor
Basal Erosion: Poor








Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: NE Quad Interior Year 2003
Treatment
Treatment:
Repointing (sq ft): 5.0
Masonry: 5.0
Stone replaced (#): 20.0
Mortar (# buckets): 7.0








Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: NW Quad Interior Year 2003
Condition
Condition:
Note:
     no comment on pres doc, but treatment work was done








Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: NW Quad Interior Year 2003
Treatment
Treatment:
Repointing (sq ft): 6.0
Capping: 3.0
Mortar (# buckets): 7.0








Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: SE Quad Capping Year 2003
Treatment
Photo type: After 97640
Image #: 097640
Catalog #:        Accession #:
Treatment:
Treatment comment: After photos, but no indication of what was done








Tsin Kletzin 29SJ 385 Room: Kiva A Story: 1st Story Wall: SE Quad Capping Year 2003
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor