Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 145 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 14/6/2016 End: 14/6/2016 Person Days: 1.0
 
Overall Comments: Duraweld C mix given as 1 gallon to 5 gallons water and mortar thickness described as soft/wetter



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 145 Story: 1st Story Wall: North Interior Year 2016
Condition
Photo type: Before 123584
Image #: 123584
Catalog #:        Accession #: 903
Condition:
Mortar Erosion: Unspecified








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 145 Story: 1st Story Wall: North Interior Year 2016
Treatment
Photo type: After 123786
Image #: 123786
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.25








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 145 Story: 1st Story Wall: West Interior Year 2016
Condition
Photo type: Before 123603
Image #: 123603
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 145 Story: 1st Story Wall: West Interior Year 2016
Treatment
Photo type: After 123787
Image #: 123787
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 2.0
Stone replaced (#): 6.0
Mortar (# buckets): 0.75