Tsin Kletzin 29SJ 385 Room: Room 55 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 2/5/2016 End: 2/5/2016 Person Days: 1.0
 
Overall Comments: mortar thickness is described as soft/wetter on the mortar mixes and additives form for the site



Tsin Kletzin 29SJ 385 Room: Room 55 Story: 1st Story Wall: North Interior Year 2016
Condition
Condition:
Mortar Erosion: Unspecified








Tsin Kletzin 29SJ 385 Room: Room 55 Story: 1st Story Wall: North Interior Year 2016
Treatment
Photo type: After 123454
Image #: 123454
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.5








Tsin Kletzin 29SJ 385 Room: Room 55 Story: 1st Story Wall: West Interior Year 2016
Treatment
Photo type: After 123455
Image #: 123455
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 5.0
Mortar (# buckets): 1.0








Tsin Kletzin 29SJ 385 Room: Room 55 Story: 1st Story Wall: West Interior Year 2016
Condition
Condition:
Mortar Erosion: Unspecified