Tsin Kletzin 29SJ 385 Room: Room 10 Story: 1 Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East, West
Start: 2/5/2016 End: 2/5/2016 Person Days: 1.0
 
Overall Comments: The mortar thickness on the mortar mixes and additives form for the site is described as soft/wetter



Tsin Kletzin 29SJ 385 Room: Room 10 Story: 1 Wall: North Interior Year 2016
Condition
Photo type: Before 123318
Image #: 123318
Catalog #:        Accession #: 903
Condition:
Mortar Erosion: Unspecified
Note:
     board should read story 1








Tsin Kletzin 29SJ 385 Room: Room 10 Story: 1 Wall: North Interior Year 2016
Treatment
Photo type: After 123322
Image #: 123322
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 1.0
Mortar (# buckets): 0.125
Treatment comment: 1/8 bucket mortar








Tsin Kletzin 29SJ 385 Room: Room 10 Story: 1 Wall: East Interior Year 2016
Condition
Photo type: Before 123319
Image #: 123319
Catalog #:        Accession #: 903
Condition:
Mortar Erosion: Unspecified
Note:
     board should read story 1








Tsin Kletzin 29SJ 385 Room: Room 10 Story: 1 Wall: East Interior Year 2016
Treatment
Photo type: After 123321
Image #: 123321
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.125
Treatment comment: 1/8 bucket mortar








Tsin Kletzin 29SJ 385 Room: Room 10 Story: 1 Wall: West Interior Year 2016
Condition
Photo type: Before 123320
Image #: 123320
Catalog #:        Accession #: 903
Condition:
Mortar Erosion: Unspecified
Note:
     board should read story 1








Tsin Kletzin 29SJ 385 Room: Room 10 Story: 1 Wall: West Interior Year 2016
Treatment
Photo type: After 123323
Image #: 123323
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 3.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.125
Treatment comment: 1/8 bucket mortar