Tsin Kletzin 29SJ 385 Room: Room 8 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 28/4/2016 End: 28/4/2016 Person Days: 1.0
 
Overall Comments: The mortar thickness on the mortar mixes and additives form for the site is described as soft/wetter



Tsin Kletzin 29SJ 385 Room: Room 8 Story: 1st Story Wall: North Exterior Year 2016
Treatment
Photo type: After 123306
Image #: 123306
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 50.0
Mortar (# buckets): 0.75








Tsin Kletzin 29SJ 385 Room: Room 8 Story: 1st Story Wall: North Exterior Year 2016
Treatment
Photo type: After 123307
Image #: 123307
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 50.0
Mortar (# buckets): 0.75