Penasco Blanco 29SJ 410 Room: Room 54 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 1/6/2016 End: 1/6/2016 Person Days: 1.0
 
Overall Comments: Mortar thickness on form is softer/wetter Daraweld C mixes on site overview form are 1 gallon to 4 gallons and 5 gallons water



Penasco Blanco 29SJ 410 Room: Room 54 Story: 1st Story Wall: North Interior Year 2016
Condition
Photo type: Before 123224
Image #: 123224
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 54 Story: 1st Story Wall: North Interior Year 2016
Treatment
Photo type: After 123226
Image #: 123226
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 18.0
Mortar (# buckets): 0.25








Penasco Blanco 29SJ 410 Room: Room 54 Story: 1st Story Wall: West Interior Year 2016
Condition
Photo type: Before 123225
Image #: 123225
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 54 Story: 1st Story Wall: West Interior Year 2016
Treatment
Photo type: After 123227
Image #: 123227
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 9.0
Mortar (# buckets): 0.5