Penasco Blanco 29SJ 410 Room: Room 104 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, South
Start: 6/6/2016 End: 6/6/2016 Person Days: 1.0
 
Overall Comments: site summary form says mortar thickness was soft/wetter and that the duraweld mixes used across the site were 1 to 4 or to 5 gallons of water.



Penasco Blanco 29SJ 410 Room: Room 104 Story: 1st Story Wall: South Interior Year 2016
Condition
Photo type: Before 123269
Image #: 123269
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 104 Story: 1st Story Wall: South Interior Year 2016
Treatment
Photo type: After 123271
Image #: 123271
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 7.0
Stone replaced (#): 5.0
Mortar (# buckets): 1.0








Penasco Blanco 29SJ 410 Room: Room 104 Story: 1st Story Wall: South Exterior Year 2016
Condition
Photo type: Before 123270
Image #: 123270
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 104 Story: 1st Story Wall: South Exterior Year 2016
Treatment
Photo type: After 123272
Image #: 123272
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 7.0
Mortar (# buckets): 1.0