Penasco Blanco 29SJ 410 Room: Room 13 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 23/5/2016 End: 23/5/2016 Person Days: 0.5
 
Overall Comments: mortar thickness soft/wetter on site overview form; duraweld mixture given as 1 to 4 or 5 gallons of water on same form.



Penasco Blanco 29SJ 410 Room: Room 13 Story: 1st Story Wall: East Interior Year 2016
Condition
Photo type: Before 122859
Image #: 122859
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 13 Story: 1st Story Wall: East Interior Year 2016
Treatment
Photo type: After 122860
Image #: 122860
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 11.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.5