Penasco Blanco 29SJ 410 Room: Room 57 Story: 3 Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South, West
Start: 31/5/2016 End: 1/6/2016 Person Days: 2.0
 
Overall Comments: Site overview form lists mortar thickness as soft/wetter and the duraweld mixes used on site as 1 to 4 and 5 gallons of water.



Penasco Blanco 29SJ 410 Room: Room 57 Story: 3 Wall: East Interior Year 2016
Condition
Photo type: Before 123228
Image #: 123228
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 57 Story: 3 Wall: East Interior Year 2016
Treatment
Photo type: After 123231
Image #: 123231
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 18.0
Mortar (# buckets): 2.0








Penasco Blanco 29SJ 410 Room: Room 57 Story: 3 Wall: South Interior Year 2016
Condition
Photo type: Before 123229
Image #: 123229
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 57 Story: 3 Wall: South Interior Year 2016
Treatment
Photo type: After 123232
Image #: 123232
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 30.0
Masonry: 7.0
Stone replaced (#): 30.0
Stone fresh: 10.0
Mortar (# buckets): 6.0








Penasco Blanco 29SJ 410 Room: Room 57 Story: 3 Wall: West Interior Year 2016
Condition
Photo type: Before 123230
Image #: 123230
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 57 Story: 3 Wall: West Interior Year 2016
Treatment
Photo type: After 123233
Image #: 123233
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 8.0
Masonry: 1.0
Stone replaced (#): 12.0
Stone fresh: 4.0
Mortar (# buckets): 2.0