Penasco Blanco 29SJ 410 Room: Room 108 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East
Start: 6/6/2016 End: Person Days: 1.0
 
Overall Comments: mortar thickness is described as soft/wetter on site overview form; duraweld mixes of 1 gallon to 4 and 5 gallons water on site overview form



Penasco Blanco 29SJ 410 Room: Room 108 Story: 1st Story Wall: North Exterior Year 2016
Documentation
Photo type: Documentation, No Treatment 123157
Image #: 123157
Catalog #:        Accession #: 903
Documentation:








Penasco Blanco 29SJ 410 Room: Room 108 Story: 1st Story Wall: North Exterior Year 2016
Documentation
Photo type: Documentation, No Treatment 123155
Image #: 123155
Catalog #:        Accession #: 903
Documentation:








Penasco Blanco 29SJ 410 Room: Room 108 Story: 1st Story Wall: East Interior Year 2016
Condition
Photo type: Before 123156
Image #: 123156
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 108 Story: 1st Story Wall: East Interior Year 2016
Treatment
Photo type: After 123158
Image #: 123158
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 8.0
Mortar (# buckets): 0.5