Penasco Blanco 29SJ 410 Room: Room 99 Story: 2 Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South, West
Start: 24/5/2016 End: 24/5/2016 Person Days: 1.0
 
Overall Comments: mortar thickness is described as soft/wetter on site overview form; duraweld mixes of 1 gallon to 4 and 5 gallons water on site overview form



Penasco Blanco 29SJ 410 Room: Room 99 Story: 2 Wall: East Interior Year 2016
Condition
Photo type: Before 123143
Image #: 123143
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 99 Story: 2 Wall: East Interior Year 2016
Treatment
Photo type: After 123146
Image #: 123146
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.125
Treatment comment: 1/8 bucket of mortar used








Penasco Blanco 29SJ 410 Room: Room 99 Story: 2 Wall: South Interior Year 2016
Condition
Photo type: Before 123144
Image #: 123144
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 99 Story: 2 Wall: South Interior Year 2016
Treatment
Photo type: After 123147
Image #: 123147
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 19.0
Stone replaced (#): 7.0
Mortar (# buckets): 0.5








Penasco Blanco 29SJ 410 Room: Room 99 Story: 2 Wall: West Interior Year 2016
Condition
Photo type: Before 123145
Image #: 123145
Catalog #:        Accession #: 903
Condition:








Penasco Blanco 29SJ 410 Room: Room 99 Story: 2 Wall: West Interior Year 2016
Treatment
Photo type: After 123148
Image #: 123148
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 18.0
Mortar (# buckets): 0.25