Penasco Blanco 29SJ 410 Room: Kiva A Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: SE Quad, SE Quad, SW Quad
Start: 25/5/2016 End: 25/5/2016 Person Days:
 
Overall Comments: mortar thickness is described as soft/wetter on site overview form; duraweld mixes of 1 gallon to 4 and 5 gallons water on site overview form



Penasco Blanco 29SJ 410 Room: Kiva A Story: 1st Story Wall: SE Quad Interior Year 2016
Condition
Photo type: Before 122983
Image #: 122983
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Kiva A Story: 1st Story Wall: SE Quad Interior Year 2016
Documentation
Photo type: Documentation, No Treatment 122986
Image #: 122986
Catalog #:        Accession #: 903
Documentation:








Penasco Blanco 29SJ 410 Room: Kiva A Story: 1st Story Wall: SE Quad Exterior Year 2016
Documentation
Photo type: Documentation, No Treatment 122987
Image #: 122987
Catalog #:        Accession #: 903
Documentation:








Penasco Blanco 29SJ 410 Room: Kiva A Story: 1st Story Wall: SW Quad Interior Year 2016
Condition
Photo type: Before 122982
Image #: 122982
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Kiva A Story: 1st Story Wall: SW Quad Interior Year 2016
Treatment
Photo type: After 122984
Image #: 122984
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 9.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5