Penasco Blanco 29SJ 410 Room: Room 12 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 23/5/2016 End: 23/5/2016 Person Days: 1.0
 
Overall Comments: Mortar thickness on form is softer/wetter Daraweld C mixes on site overview form are 1 gallon to 4 gallons and 5 gallons water



Penasco Blanco 29SJ 410 Room: Room 12 Story: 1st Story Wall: South Interior Year 2016
Condition
Photo type: Before 122856
Image #: 122856
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 12 Story: 1st Story Wall: South Interior Year 2016
Treatment
Photo type: After 122857
Image #: 122857
Catalog #:        Accession #: 903
Treatment:
Repointing (sq ft): 15.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.25