Penasco Blanco 29SJ 410 Room: Room 10 Story: 2 Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East, South
Start: 20/5/2016 End: 23/5/2016 Person Days: 0.5
 
Overall Comments: Mortar thickness on form is softer/wetter Daraweld C mixes on site overview form are 1 gallon to 4 gallons and 5 gallons water



Penasco Blanco 29SJ 410 Room: Room 10 Story: 2 Wall: North Interior Year 2016
Condition
Photo type: Before 122846
Image #: 122846
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 10 Story: 2 Wall: North Interior Year 2016
Treatment
Photo type: After 123540
Image #: 123540
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.25








Penasco Blanco 29SJ 410 Room: Room 10 Story: 2 Wall: East Interior Year 2016
Condition
Photo type: Before 122847
Image #: 122847
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 10 Story: 2 Wall: East Interior Year 2016
Treatment
Photo type: After 122849
Image #: 122849
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 5.0
Stone replaced (#): 2.0
Mortar (# buckets): 0.25








Penasco Blanco 29SJ 410 Room: Room 10 Story: 2 Wall: South Interior Year 2016
Condition
Photo type: Before 122848
Image #: 122848
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 10 Story: 2 Wall: South Interior Year 2016
Treatment
Photo type: After 122850
Image #: 122850
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Mortar (# buckets): 0.25