Penasco Blanco 29SJ 410 Room: Room 5 Story: 1st Story Year 2016
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West
Start: 20/5/2016 End: 20/5/2016 Person Days: 0.75
 
Overall Comments: Mortar thickness on form is softer/wetter Daraweld C mixes on site overview form are 1 gallon to 4 gallons and 5 gallons water



Penasco Blanco 29SJ 410 Room: Room 5 Story: 1st Story Wall: East Exterior Year 2016
Condition
Photo type: Before 122798
Image #: 122798
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 5 Story: 1st Story Wall: East Exterior Year 2016
Treatment
Photo type: After 122800
Image #: 122800
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Stone replaced (#): 6.0
Mortar (# buckets): 1.0








Penasco Blanco 29SJ 410 Room: Room 5 Story: 1st Story Wall: West Interior Year 2016
Condition
Photo type: Before 122799
Image #: 122799
Catalog #:        Accession #: 903
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Penasco Blanco 29SJ 410 Room: Room 5 Story: 1st Story Wall: West Interior Year 2016
Treatment
Photo type: After 122801
Image #: 122801
Catalog #:        Accession #: 903
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 1.0
Mortar (# buckets): 1.0