Casa Rinconada 29SJ 386 Room: Room 9 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West, West
Start: 19/11/2015 End: 3/12/2015 Person Days: 1.0
 
Overall Comments: Dale Sandoval worked 11/19/15 for 0.5 of a man day; Victor Beyale worked 12/03/15 for 0.5 of a man day.



Casa Rinconada 29SJ 386 Room: Room 9 Story: 1st Story Wall: East Interior Year 2015
Condition
Photo type: Before 122547
Image #: 122547
Catalog #:        Accession #: 894
Condition:
Mortar Erosion: Poor








Casa Rinconada 29SJ 386 Room: Room 9 Story: 1st Story Wall: East Interior Year 2015
Treatment
Photo type: After 122563
Image #: 122563
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 39.0
Mortar (# buckets): 0.5








Casa Rinconada 29SJ 386 Room: Room 9 Story: 1st Story Wall: West Interior Year 2015
Condition
Photo type: Before 122548
Image #: 122548
Catalog #:        Accession #: 894
Condition:
Mortar Erosion: Poor








Casa Rinconada 29SJ 386 Room: Room 9 Story: 1st Story Wall: West Interior Year 2015
Treatment
Photo type: After 122564
Image #: 122564
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 10.0
Mortar (# buckets): 0.25








Casa Rinconada 29SJ 386 Room: Room 9 Story: 1st Story Wall: West Exterior Year 2015
Condition
Photo type: Before 121961
Image #: 121961
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Casa Rinconada 29SJ 386 Room: Room 9 Story: 1st Story Wall: West Exterior Year 2015
Treatment
Photo type: After 122577
Image #: 122577
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 21.0
Masonry: 3.0
Stone fresh: 4.0
Mortar (# buckets): 0.5