Bc 50-Tseh So 29SJ 394 Room: Room 33 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 2/11/2015 End: 2/11/2015 Person Days: 0.5
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 33 Story: 1st Story Wall: North Interior Year 2015
Condition
Photo type: Before 121801
Image #: 121801
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 33 Story: 1st Story Wall: North Interior Year 2015
Treatment
Photo type: After 121826
Image #: 121826
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 8.0
Mortar (# buckets): 0.25








Bc 50-Tseh So 29SJ 394 Room: Room 33 Story: 1st Story Wall: West Interior Year 2015
Condition
Photo type: Before 121800
Image #: 121800
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 33 Story: 1st Story Wall: West Interior Year 2015
Treatment
Photo type: After 121825
Image #: 121825
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 30.0
Stone replaced (#): 6.0
Stone fresh: 1.0
Mortar (# buckets): 2.75