Bc 50-Tseh So 29SJ 394 Room: Room 19 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 2/11/2015 End: 2/11/2015 Person Days: 0.5
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 19 Story: 1st Story Wall: North Interior Year 2015
Condition
Photo type: Before 121798
Image #: 121798
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 19 Story: 1st Story Wall: North Interior Year 2015
Treatment
Photo type: After 122591
Image #: 122591
Catalog #:        Accession #: 894
Treatment:
Basal Wall Repair:
Repointing (sq ft): 3.0
Masonry: 0.5
Stone fresh: 1.0
Mortar (# buckets): 1.0








Bc 50-Tseh So 29SJ 394 Room: Room 19 Story: 1st Story Wall: West Interior Year 2015
Condition
Photo type: Before 121797
Image #: 121797
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 19 Story: 1st Story Wall: West Interior Year 2015
Treatment
Photo type: After 121817
Image #: 121817
Catalog #:        Accession #: 894
Treatment:
Basal Wall Repair:
Repointing (sq ft): 7.0
Masonry: 3.0
Stone fresh: 4.0
Mortar (# buckets): 1.0