Bc 50-Tseh So 29SJ 394 Room: Room 10 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 21/10/2015 End: 22/10/2015 Person Days: 2.0
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 10 Story: 1st Story Wall: East Interior Year 2015
Treatment
Photo type: After 121814
Image #: 121814
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 3.0
Stone replaced (#): 17.0
Mortar (# buckets): 1.5








Bc 50-Tseh So 29SJ 394 Room: Room 10 Story: 1st Story Wall: East Interior Year 2015
Condition
Photo type: Before 121776
Image #: 121776
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor