Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 22/10/2015 End: 27/10/2015 Person Days: 2.0
 
Overall Comments: Dale Sandoval worked on wall 10/27/2015, 1 manday.



Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: East Interior Year 2015
Treatment
Photo type: After 121812
Image #: 121812
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Stone replaced (#): 14.0
Mortar (# buckets): 1.5








Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: East Interior Year 2015
Condition
Photo type: Before 121775
Image #: 121775
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 9 Story: 1st Story Wall: South Interior Year 2015
Condition
Photo type: Before 121799
Image #: 121799
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor