Bc 50-Tseh So 29SJ 394 Room: Room 8 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 26/10/2015 End: 26/10/2015 Person Days: 0.5
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 8 Story: 1st Story Wall: South Interior Year 2015
Condition
Photo type: Before 121780
Image #: 121780
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 8 Story: 1st Story Wall: South Interior Year 2015
Treatment
Photo type: After 121811
Image #: 121811
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 14.0
Mortar (# buckets): 0.5








Bc 50-Tseh So 29SJ 394 Room: Room 8 Story: 1st Story Wall: West Interior Year 2015
Condition
Photo type: Before 121779
Image #: 121779
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 8 Story: 1st Story Wall: West Interior Year 2015
Treatment
Photo type: After 121810
Image #: 121810
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 12.0
Masonry: 2.0
Stone fresh: 3.0
Mortar (# buckets): 1.0