Bc 50-Tseh So 29SJ 394 Room: Room 2 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South
Start: 28/10/2015 End: 28/10/2015 Person Days: 1.0
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 2 Story: 1st Story Wall: North Interior Year 2015
Condition
Photo type: Before 121787
Image #: 121787
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 2 Story: 1st Story Wall: North Interior Year 2015
Treatment
Photo type: After 121804
Image #: 121804
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.25








Bc 50-Tseh So 29SJ 394 Room: Room 2 Story: 1st Story Wall: South Interior Year 2015
Condition
Photo type: Before 121786
Image #: 121786
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 2 Story: 1st Story Wall: South Interior Year 2015
Treatment
Photo type: After 121803
Image #: 121803
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 12.0
Stone replaced (#): 1.0
Mortar (# buckets): 1.0