Una Vida 29SJ 391 Room: Room 30 Story: 1st Story Year 2015
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South
Start: 13/7/2015 End: 15/7/2015 Person Days: 3.0
 
Overall Comments: Dale Sandoval worked 7/14/2015, on walls for 0.5 manday.



Una Vida 29SJ 391 Room: Room 30 Story: 1st Story Wall: North Interior Year 2015
Condition
Photo type: Before 121670
Image #: 121670
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Una Vida 29SJ 391 Room: Room 30 Story: 1st Story Wall: North Interior Year 2015
Treatment
Photo type: After 121714
Image #: 121714
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 5.0
Mortar (# buckets): 0.5








Una Vida 29SJ 391 Room: Room 30 Story: 1st Story Wall: South Exterior Year 2015
Condition
Photo type: Before 121671
Image #: 121671
Catalog #:        Accession #: 894
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Una Vida 29SJ 391 Room: Room 30 Story: 1st Story Wall: South Exterior Year 2015
Treatment
Photo type: After 121715
Image #: 121715
Catalog #:        Accession #: 894
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 31.0
Masonry: 4.0
Stone replaced (#): 10.0
Stone fresh: 10.0
Mortar (# buckets): 4.0