Chetro Ketl 29SJ 1928 Room: Room 73 Story: 1st Story Year 1993
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Dirt Duraweld C (1:4)
2.0 Sand Duraweld (other)
1.0 Clay
Comments:
Walls recorded: North, South
Start: 26/8/1993 End: 22/9/1993 Person Days: 6.5
 
Overall Comments: Sierra Club worked on North Wall from 9/14/93 to 9/15/93, 1 manday.



Chetro Ketl 29SJ 1928 Room: Room 73 Story: 1st Story Wall: North Interior Year 1993
Condition
Photo type: Before 107795
Image #: 107795
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor
Note:
     Loose/ fallen chinking








Chetro Ketl 29SJ 1928 Room: Room 73 Story: 1st Story Wall: North Interior Year 1993
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 17.0
Masonry: 3.0
Stone replaced (#): 62.0
Mortar (# buckets): 5.0








Chetro Ketl 29SJ 1928 Room: Room 73 Story: 1st Story Wall: South Interior Year 1993
Condition
Photo type: Before 107794
Image #: 107794
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Chetro Ketl 29SJ 1928 Room: Room 73 Story: 1st Story Wall: South Interior Year 1993
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 6.0
Masonry: 3.0
Stone replaced (#): 114.0
Mortar (# buckets): 4.0