Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Year 1993
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Dirt Duraweld C (1:4)
2.0 Sand Duraweld (other)
1.0 Clay
Comments:
Walls recorded: East, South, West
Start: 20/9/1993 End: 29/9/1993 Person Days: 3.5
 
Overall Comments: Chee Mitchell worked in Room 63 on 9/28/93 to 9/29/93, 1 manday.



Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Wall: East Interior Year 1993
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 9.0
Stone replaced (#): 4.0
Mortar (# buckets): 1.0








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Wall: East Interior Year 1993
Condition
Photo type: Before 107783
Image #: 107783
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     Loose/ fallen chinking








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Wall: South Interior Year 1993
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 23.0
Stone replaced (#): 18.0
Mortar (# buckets): 2.5
Vertical Wall Repair:
Repointing (sq ft): 54.0
Mortar (# buckets): 2.5
Treatment comment: Replace stones.








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Wall: South Interior Year 1993
Condition
Photo type: Before 107781
Image #: 107781
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     Loose/ fallen chinking
Mortar Erosion: Poor
Basal Erosion: Poor








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Wall: South Interior Year 1993
Condition
Photo type: Before 107782
Image #: 107782
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     Loose/ fallen chinking
Mortar Erosion: Poor
Basal Erosion: Poor








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Wall: West Interior Year 1993
Condition
Photo type: Before 107784
Image #: 107784
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 2nd Story Wall: West Interior Year 1993
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 54.0
Mortar (# buckets): 2.5