Wijiji 29SJ 577 Room: Room 41 Story: 2nd Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South
Start: 22/9/2014 End: 22/9/2014 Person Days: 0.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 41 Story: 2nd Story Wall: North Interior Year 2014
Condition
Photo type: Before 121460
Image #: 121460
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 41 Story: 2nd Story Wall: North Interior Year 2014
Treatment
Photo type: After 121562
Image #: 121562
Catalog #:        Accession #: 889
Treatment:
Basal Wall Repair:
Repointing (sq ft): 3.0
Stone replaced (#): 2.0
Mortar (# buckets): 0.5








Wijiji 29SJ 577 Room: Room 41 Story: 2nd Story Wall: South Interior Year 2014
Condition
Photo type: Before 121461
Image #: 121461
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 41 Story: 2nd Story Wall: South Interior Year 2014
Treatment
Photo type: After 121563
Image #: 121563
Catalog #:        Accession #: 889
Treatment:
Basal Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.5