Wijiji 29SJ 577 Room: Room 40 Story: 1st Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 22/9/2014 End: 22/9/2014 Person Days: 0.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 40 Story: 1st Story Wall: North Interior Year 2014
Condition
Photo type: Before 121467
Image #: 121467
Catalog #:        Accession #: 889
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 40 Story: 1st Story Wall: North Interior Year 2014
Treatment
Photo type: After 121569
Image #: 121569
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 2.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.5