Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 24/9/2014 End: 24/9/2014 Person Days: 1.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: South Interior Year 2014
Condition
Photo type: Before 121435
Image #: 121435
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: South Interior Year 2014
Treatment
Photo type: After 121540
Image #: 121540
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 16.0
Mortar (# buckets): 0.25








Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: West Interior Year 2014
Treatment
Photo type: After 121541
Image #: 121541
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 18.0
Mortar (# buckets): 0.75








Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: West Interior Year 2014
Condition
Photo type: Before 121436
Image #: 121436
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor