Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 22/9/2014 End: 22/9/2014 Person Days: 1.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: North Interior Year 2014
Condition
Photo type: Before 121442
Image #: 121442
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: North Interior Year 2014
Treatment
Photo type: After 121547
Image #: 121547
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 28.0
Mortar (# buckets): 0.25








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: West Interior Year 2014
Condition
Photo type: Before 121443
Image #: 121443
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: West Interior Year 2014
Treatment
Photo type: After 121548
Image #: 121548
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 55.0
Mortar (# buckets): 1.0