Wijiji 29SJ 577 Room: Room 21 Story: 2nd Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 8/10/2014 End: 8/10/2014 Person Days: 1.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 21 Story: 2nd Story Wall: East Interior Year 2014
Treatment
Photo type: After 121588
Image #: 121588
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 5.0
Mortar (# buckets): 0.25








Wijiji 29SJ 577 Room: Room 21 Story: 2nd Story Wall: East Interior Year 2014
Condition
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 21 Story: 2nd Story Wall: South Interior Year 2014
Condition
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 21 Story: 2nd Story Wall: South Interior Year 2014
Treatment
Photo type: After 121589
Image #: 121589
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 1.0