Wijiji 29SJ 577 Room: Room 13 Story: 2nd Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East, South
Start: 17/9/2014 End: 18/9/2014 Person Days: 2.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 13 Story: 2nd Story Wall: North Interior Year 2014
Condition
Photo type: Before 121432
Image #: 121432
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 13 Story: 2nd Story Wall: North Interior Year 2014
Treatment
Photo type: After 121537
Image #: 121537
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 5.0
Stone fresh: 5.0
Mortar (# buckets): 2.0








Wijiji 29SJ 577 Room: Room 13 Story: 2nd Story Wall: East Interior Year 2014
Condition
Photo type: Before 121433
Image #: 121433
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 13 Story: 2nd Story Wall: East Interior Year 2014
Treatment
Photo type: After 121538
Image #: 121538
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 7.0
Mortar (# buckets): 2.0








Wijiji 29SJ 577 Room: Room 13 Story: 2nd Story Wall: South Interior Year 2014
Condition
Photo type: Before 121434
Image #: 121434
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 13 Story: 2nd Story Wall: South Interior Year 2014
Treatment
Photo type: After 121539
Image #: 121539
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 14.0
Stone replaced (#): 3.0
Mortar (# buckets): 2.0