Wijiji Cliff Structure 572 29SJ 572 Room: Hogan 1 Story: 1st Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: NE Quad, SE Quad
Start: 9/9/2014 End: 9/9/2014 Person Days: 2.0
 
Overall Comments: Matthew Cayaditto and Victor Beyale repointed wall, each worked 1 manday.



Wijiji Cliff Structure 572 29SJ 572 Room: Hogan 1 Story: 1st Story Wall: NE Quad Exterior Year 2014
Condition
Photo type: Before 121070
Image #: 121070
Catalog #:        Accession #: 889
Condition:
Stone Erosion: Poor
Basal Erosion: Poor








Wijiji Cliff Structure 572 29SJ 572 Room: Hogan 1 Story: 1st Story Wall: NE Quad Exterior Year 2014
Treatment
Photo type: After 121503
Image #: 121503
Catalog #:        Accession #: 889
Treatment:
Basal Wall Repair:
Repointing (sq ft): 11.0
Masonry: 11.0
Stone replaced (#): 9.0
Stone fresh: 9.0
Treatment comment: Dry-wall








Wijiji Cliff Structure 572 29SJ 572 Room: Hogan 1 Story: 1st Story Wall: NE Quad Exterior Year 2014
Treatment
Photo type: After 121504
Image #: 121504
Catalog #:        Accession #: 889
Treatment:
Basal Wall Repair:
Repointing (sq ft): 11.0
Masonry: 11.0
Stone replaced (#): 9.0
Stone fresh: 9.0
Treatment comment: Dry-wall








Wijiji Cliff Structure 572 29SJ 572 Room: Hogan 1 Story: 1st Story Wall: SE Quad Interior Year 2014
Condition
Photo type: Before 121073
Image #: 121073
Catalog #:        Accession #: 889
Condition:
Basal Erosion: Poor








Wijiji Cliff Structure 572 29SJ 572 Room: Hogan 1 Story: 1st Story Wall: SE Quad Interior Year 2014
Treatment
Photo type: After 121505
Image #: 121505
Catalog #:        Accession #: 889
Treatment:
Basal Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.25