29SJ 931 29SJ 931 Room: Room 1 Story: 1st Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 8/9/2014 End: 8/9/2014 Person Days: 1.0
 
Overall Comments:



29SJ 931 29SJ 931 Room: Room 1 Story: 1st Story Wall: East Interior Year 2014
Condition
Condition:
Mortar Erosion: Poor
Basal Erosion: Poor








29SJ 931 29SJ 931 Room: Room 1 Story: 1st Story Wall: East Interior Year 2014
Treatment
Photo type: During 121487
Image #: 121487
Catalog #:        Accession #: 889
Treatment:
Basal Wall Repair:
Repointing (sq ft): 3.0
Stone replaced (#): 1.0
Mortar (# buckets): 1.0








29SJ 931 29SJ 931 Room: Room 1 Story: 1st Story Wall: East Interior Year 2014
Treatment
Photo type: After 121494
Image #: 121494
Catalog #:        Accession #: 889
Treatment:
Basal Wall Repair:
Repointing (sq ft): 3.0
Stone replaced (#): 1.0
Mortar (# buckets): 1.0