Pueblo Bonito 29SJ 387 Room: Room 293 Story: 2nd Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South
Start: 2/7/2014 End: 7/7/2014 Person Days: 3.0
 
Overall Comments: Victor Beyale also worked on the west wall on 8/13/2014, 1 manday and repointed 28 sq.ft. of wall.



Pueblo Bonito 29SJ 387 Room: Room 293 Story: 2nd Story Wall: West Interior Year 2014
Condition
Photo type: Before 121244
Image #: 121244
Catalog #:        Accession #: 889
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 293 Story: 2nd Story Wall: West Interior Year 2014
Treatment
Photo type: After 121275
Image #: 121275
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 28.0
Mortar (# buckets): 0.25








Pueblo Bonito 29SJ 387 Room: Room 293 Story: 2nd Story Wall: South Interior Year 2014
Treatment
Photo type: After 121607
Image #: 121607
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 15.0
Mortar (# buckets): 0.5








Pueblo Bonito 29SJ 387 Room: Room 293 Story: 2nd Story Wall: South Interior Year 2014
Condition
Condition:
Mortar Erosion: Poor