Pueblo Bonito 29SJ 387 Room: Room 283 Story: 1st Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West
Start: 21/7/2014 End: 23/7/2014 Person Days: 3.0
 
Overall Comments: Matthew Cayaditto worked on wall from 7/31/14 to 8/4/14, 3 mandays.



Pueblo Bonito 29SJ 387 Room: Room 283 Story: 1st Story Wall: East Interior Year 2014
Condition
Photo type: Before 120998
Image #: 120998
Catalog #:        Accession #: 889
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 283 Story: 1st Story Wall: East Interior Year 2014
Treatment
Photo type: After 121151
Image #: 121151
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 26.0
Masonry: 20.0
Stone replaced (#): 50.0
Stone fresh: 20.0
Mortar (# buckets): 10.0








Pueblo Bonito 29SJ 387 Room: Room 283 Story: 1st Story Wall: West Exterior Year 2014
Condition
Photo type: Before 120999
Image #: 120999
Catalog #:        Accession #: 889
Condition:
Mortar Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 283 Story: 1st Story Wall: West Exterior Year 2014
Treatment
Photo type: After 121278
Image #: 121278
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 28.0
Stone replaced (#): 6.0
Mortar (# buckets): 2.0