Wijiji Cliff Structure 554 29SJ 554 Room: Room Story: 1st Story Year 2014
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 25/2/2014 End: 25/2/2014 Person Days: 0.5
 
Overall Comments: Wall is a dry-laid wall, no mortar present, the preservation crew re-laid the stones and used 20 buckets of dirt to refill the base with dirt.



Wijiji Cliff Structure 554 29SJ 554 Room: Room Story: 1st Story Wall: South Exterior Year 2014
Condition
Photo type: Before 121060
Image #: 121060
Catalog #:        Accession #: 889
Condition:
Stone Erosion: Poor
Basal Erosion: Poor








Wijiji Cliff Structure 554 29SJ 554 Room: Room Story: 1st Story Wall: South Exterior Year 2014
Treatment
Photo type: After 121061
Image #: 121061
Catalog #:        Accession #: 889
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Masonry: 9.0
Stone replaced (#): 30.0
Stone fresh: 20.0
Treatment comment: Reset 9sq ft of dry wall and backfilled area with 20 buckets of dirt.