Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 144 Story: 2nd Story Year 2013
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 9/9/2013 End: 11/9/2013 Person Days: 2.0
 
Overall Comments: On 2nd story on South wall there were lots of bad stones and loose mud and dirt. It really needs refix with good stones and fresh mud. Remove bad stones, dirt, old mud. Using good fresh mud replaced good stones and repointed with daraweld mortar.



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 144 Story: 2nd Story Wall: South Interior Year 2013
Condition
Photo type: Before 118707
Image #: 118707
Catalog #:        Accession #: 880
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 144 Story: 2nd Story Wall: South Interior Year 2013
Treatment
Photo type: After 118833
Image #: 118833
Catalog #:        Accession #: 880
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 10.0
Masonry: 1.0
Stone replaced (#): 23.0
Mortar (# buckets): 6.0